Pipe installation folder

Weld Pipe Clamp assembly prior to assembly in order to better determine the direction of the folder, it is recommended and marked the first in a fixed place, after welding the welding, pipe clip embedded on the lower half of the body, put the pipe to be fixed. Sprinkle the other half pipe clip body and cover, tighten the screw. Avoid direct soldering pipes have been installed folder of the floor.
Fitted to rail, rail can be welded on, or with screws, then push the orbit within the rail nut and turn 90 degrees, the next half of the clamp nut embedded in the body, put the pipe to be fixed , add the folder on the half-pipe body and the cover with screws.
Stacked assembly, based on the rail can be welded or bolted, first install the upper and lower half of the clamp body, put the pipe to be fixed on the half pipe clip and put on the body, with screws, through the locking cap board to prevent it from rotating. Casting Machines Then install a second clamp, the method above.
Pipe assembly, assembly pipe, the elbow should be directly in front and rear pipe clamp with Win. Recommended points of support should be fixed position.

Related reading: http://www.zlmachinery.com/news/Pipe-installation-folder.htm